SOLAR PROGRESS BILLING CHECK — FIRST REVIEW For commercial solar project managers, billing coordinators and finance reviewers. Start with one billing package Bring the PO or contract authorization, approved change orders, previous billings, the proposed invoice and the acceptance/closeout checklist for this milestone. Have the accountable reviewer confirm what is due now and the current net amount that can be billed, including any applicable adjustments. Unknown is not zero. Ask your assistant “Check this milestone billing package before it goes to finance. Is the proposed amount within the reviewed limit? What paperwork is missing, who owns it, and which documents are due at final acceptance rather than this milestone?” Use the findings with your team PM: “Is the work acceptance recorded for this milestone?” Billing: “Does the proposed invoice fit the approved limit and previous billings?” Interconnection: “We still need the utility authorization notice required here.” Finance: “Here are the exceptions and the records behind them. Please review.” Try the examples first The included four situations use fictional records from the published 0.6.1 manifest: missing utility evidence, a milestone overrun, an unknown billing limit, and a corrected package ready for finance review. They are separate variations, not four findings on a single live invoice. Expected results are supplied records; this download does not execute a hosted check or validate real customer outcomes. Setup and price The listing provides 10 free checks. The USD 19/month checkout is Stripe TEST MODE for 100 checks per paid period; no live payment or automatic overage. Consult the live listing for current terms. Running checks needs a connected supported client such as Claude Code or Codex, not a file-only chat. Review the exact connection and product-key instructions on the listing before using private records. The sample report and download require no sign-in. Do not share secrets or private customer records through these public sample files. Scope The tool reviews supplied figures, customer-approved milestone requirements and recorded acceptance. It does not independently verify the ledger, calculate retainage, stored materials or AIA pay applications, approve payment, issue invoices, or cover supplier invoices. Finance still decides whether to submit. No invoice or customer message is sent automatically. Savings are not measured. FILE CHECKLIST AND FIRST-RUN HANDOFF Use this for a commercial solar contractor’s milestone billing package before finance reviews it. It checks the supplied billing limit and required acceptance or closeout evidence, rather than supplier invoices or system performance. Contract and approved changes Have the PO or contract authorization and approved change orders for one project and one billing milestone. Previous billings and proposed invoice Bring the billing history and proposed amount. Finance must confirm the current net amount allowed at this milestone, including applicable adjustments; remaining contract value alone is not that limit. Milestone checklist and evidence Bring the reviewer-confirmed requirements, acceptance records and relevant utility or closeout evidence. Identify what is due now, what is due later and who owns each outstanding item. Confirmed figures for the tool Have your assistant organize the supplied figures and evidence into the published input fields. Review those values and requirements before running a check. Unknown amounts must stay unknown. Where to use the files Use a connected Claude Code or Codex client, following Price & setup below. This listing has no upload box. The hosted tool accepts structured figures and evidence references; it does not extract uploaded PDFs or spreadsheets for you. Sample files The sample folder contains four JSON request/result examples and a readable report. Opening these files does not run a check or use your free allowance. First run 1. Open the sample report and folder without signing in. Decide whether the milestone billing checks fit your work. 2. Follow Price & setup to prepare access and connect Claude Code or Codex. Confirm sandbox test mode and your remaining allowance before running a hosted check; a file-only chat is not enough. 3. Start with one billing package. Have finance confirm the net billing limit and milestone requirements, review the prepared inputs, then run the connected check and review the exceptions before deciding whether to submit.