BLUEBEAR · SOLAR BILLING

What needs sorting before finance review?

Four separate fictional situations from the published 0.6.1 examples. Not a live invoice, payment approval or a claim of savings.

NEEDS REVIEW

Find evidence due at this milestone

Prepare the commercial-operation handoff using the approved fictional requirements. The final manual is due later.

Current stage
Commercial operation
Current missing evidence
Utility authorization notice
Final O&M manual
Not applicable yet; final acceptance only

One applicable requirement is missing. The later-stage manual does not create a blocker.

Item / statusGoverning recordWho checks it next
Utility authorization notice
missing
Fictional contract v2 section 8.1
No evidence reference supplied
Interconnection coordinator
Collect and review the applicable utility notice
Final O&M manual
not_applicable
Fictional contract v2 section 9.2
No evidence reference supplied
Closeout coordinator
Due at final acceptance, not commercial operation

Next step: The interconnection coordinator supplies the notice; an accountable reviewer confirms its actual acceptance.

Read the fictional source documents

Fictional commercial-operation requirements

Synthetic project: synthetic-solar-closeout
Commercial operation: utility authorization notice required.
Final acceptance: final O&M manual required later.
Requirements: fictional contract v2 sections 8.1 and 9.2. Applicability confirmed by synthetic project reviewer.
BLOCKED

Catch a milestone overrun despite available contract balance

The notice now has reviewer-accepted evidence. A proposed $20,000 invoice fits the $100,000 remaining authorization but exceeds the reviewed $10,000 net limit for this application.

Remaining authorization
$100,000
Proposed invoice
$20,000
Current net billing limit
$10,000

Available total authorization does not override the current milestone limit.

Item / statusGoverning recordWho checks it next
final-manual
not_applicable
Fictional contract v2 section 9.2
No evidence reference supplied
Closeout coordinator
Excluded for this milestone: Due at final acceptance, not commercial operation
invoice
blocked
Fictional finance-approved current net application limit, including applicable adjustments
No evidence reference supplied
Finance reviewer
Proposed invoice exceeds current milestone net billing limit

Next step: Finance reconciles the proposed amount with the governing milestone and approved billing record.

Read the fictional source documents

Fictional commercial-operation requirements

Synthetic project: synthetic-solar-closeout
Commercial operation: utility authorization notice required.
Final acceptance: final O&M manual required later.
Requirements: fictional contract v2 sections 8.1 and 9.2. Applicability confirmed by synthetic project reviewer.

Synthetic finance record

Remaining contract authorization: USD 100,000
Proposed current invoice: USD 20,000
Finance-confirmed current net billing limit: USD 10,000 after applicable adjustments.
No unsupported adjustments declared. Work acceptance confirmed for this milestone.
NEEDS CONFIRMATION

Keep unknown financial context unresolved

The proposed amount is reduced to $10,000, but the current net billing limit is not confirmed in this variant.

Proposed invoice
$10,000
Current net billing limit
Unknown

A complete evidence packet cannot establish financial readiness without the current reviewed limit.

Item / statusGoverning recordWho checks it next
final-manual
not_applicable
Fictional contract v2 section 9.2
No evidence reference supplied
Closeout coordinator
Excluded for this milestone: Due at final acceptance, not commercial operation
financial-context
needs_confirmation
Fictional finance-approved current net application limit, including applicable adjustments
No evidence reference supplied
Finance reviewer
Confirm the milestone, requirement applicability and net amount currently billable with an accountable finance reviewer; total remaining authorization alone is insufficient

Next step: Ask the finance reviewer to establish the net limit from the applicable agreement and accounting records.

Read the fictional source documents

Synthetic incomplete billing record

Proposed invoice: USD 10,000
Remaining authorization: USD 100,000
Current net billing limit: UNKNOWN. Do not substitute remaining authorization.
READY FOR FINANCE REVIEW

Hand the corrected package to finance

The reviewer confirms the current net limit and applicability. The proposed amount is $10,000 and applicable evidence is accepted.

Proposed and net limit
$10,000
Applicable evidence
Complete against approved fictional requirements

The supplied facts pass these limited checks. This is not invoice or payment approval.

Item / statusGoverning recordWho checks it next
final-manual
not_applicable
Fictional contract v2 section 9.2
No evidence reference supplied
Closeout coordinator
Excluded for this milestone: Due at final acceptance, not commercial operation

Next step: An authorized finance reviewer verifies underlying records and decides whether to submit. The tool does not certify engineering, verify the ledger or calculate unmodeled adjustments.

Read the fictional source documents

Synthetic reviewed application

Current milestone: commercial operation
Proposed invoice: USD 10,000
Reviewed net limit: USD 10,000
Applicable evidence: accepted
Final manual: later-stage requirement, excluded with reviewed reason.

Read-only review of supplied records. Your authorized finance reviewer decides whether to submit. No invoice is issued.

Getting-started guide